The environmental and financial advantages of Electric Vehicles (EV) are now very apparent. The social pressures to move away from traditional internal combustion engine (ICE) powered vehicles to cleaner, greener alternatives are mounting daily. Make that move to electric now and join the clean, green motoring revolution.
David Pearce Electrical can design and install the EV Charge Point that is totally aligned to your needs. From the most basic of installations to a more complex web enabled, load managed, tariff selective or renewable power priority charger, we have the knowledge and experience to guide and advise on the best value for money, future proof solution for you, your property and your vehicle.
David Pearce Electrical has been awarded 'approved' status by all of the above leading manufacturers and governing bodies.
In the residential sector all new electrical installations must be approved by Building Regulation Part P. David Pearce Electrical is NICEIC approved. This allows us to self-certify in accordance to Building Regulations for England and Wales. In 2022 we celebrated our 30th year of trading.
The level of service provided by the whole team at David Pearce Electrical has been exceptional from the initial site survey through to the completion of the works. I was given advice on the most beneficial & cost effective charging solutions that not only ticked the boxes with what I needed today but also for future vehicles that will utilise fast charge facilities. As we have a new property, keeping visible cabling and disruption to a minimum was something we were concerned about, the on-site engineers completed a very tidy installation and carried out the job with the minimum amount of hassle. A very professional outfit that I would have no hesitation in recommending to friends or family.
If your EV charging requirements are aligned to the EV Home Charge Scheme (EVHS) then you will be able to save money on your single-unit property EV charging install, provided the installation can be completed by 31st March 2022 and your claim is submitted to the DVLA by 30th April 2022.
As UK Government Office of Zero Emission Vehicles (OZEV) approved installers, we are experiencing unprecedented demand for installations in these final few weeks before the Grant opportunity ends. We currently have a 4-6 week lead time for the fulfilment of DNO approved installs. David Pearce Electrical will do everything we can to complete your install prior to March 31st but will not be held responsible or liable in any way should this not prove viable.
Please complete the following fields as thoroughly as possible. We look forward to providing you an accurate quotation based on the information you supply to us.