David Pearce Electrical was appointed the chosen contractor by Mr Bower to specify, install & commission the required single phase electric vehicle charging point at his workplace dwelling in Rufford, Nottinghamshire.
About The Project
As an approved OLEV installer David Pearce Electrical were able to complete the installation of an approved vehicle charging point taking advantage of the Electric Vehicle Home Charge Scheme Grant Funding, providing £500 towards the installation costs. Before completing the works, a site survey was carried out including a maximum demand calculation to ensure the correct EV charging unit could be selected. Included within our proposal to future proof the installation, a new sub-main supply was installed to feed a new distribution board. As the client was looking at expanding the work premises in the future, consideration was given to allow further supplies to be connected at a later date. In addition we was able to advise the client on the correct charging lead for his vehicle. The installation was completed in accordance with BS7671:2008+AM3:2015.
- Installation of 1no. 1 x 32A 7.2kW single phase electric vehicle charging unit